Fletcher Reinforcing commissioned Bishops to install reinforcing steel for some of the heavy machinery support beams and interconnecting pads at the New Tauriko Gib plant. To keep the project on track Bishops job was to install and tie reinforcing for several heavy machinery support beams that were on the critical path for the project.

A total of 300 ton of steel was used in the job with bar sizes up to 32mm