Quantum Bund Upgrade

Bishops were commissioned by the lead Mechanical contractor Page Macrae Engineering to undertake a time pressured construction of a fully lined bund extension in both the Caustic and Nitric secondary containment areas in Quantem (formerly known as Bulk Storage Terminals).
This required a fully committed team of experts in their respective field in order to achieved the necessary outcome within the allocated time frames.
With careful planning and execution the project was a success and the plant was able to commission the plant in line with the schedule to meet all external obligations.
Construction consisted of:
- New foundations for 2 x Caustic Tanks
- New foundation for a Nitric Tank
- New bund walls systems and alteration to existing bund wall systems
- Asphalt and concrete skirts to tanks
- Pipe support foundations for all Mechanical plant and access ways
- Installation of a full HDPE liner system.
- Upgrades to bund drainage system including new sumps and piping
- New roading and surfacing
- Grouting of all Mechanical plant