Red Stag Turbine and Generator Grouting

Bishops services were called on for the fast turn-around installation of the new Turbine and generator system at Red Stag.
Bishops reacted to the call and worked with the team at Red Stag to action the anchoring plan in the shortest time frame possible.
The installation was well planned and executed and the important schedule was maintained.







No items found.
